Issue Type | Priority | Status | Project | Summary | Reporter | Assignee | Updated | Created | Description |
---|---|---|---|---|---|---|---|---|---|
Task | Highest | In Progress | Heavy Tools | Machine consolidation |
Joshua Rospondek | Joshua Rospondek | 17/Feb/19 5:56 AM | 17/Feb/19 5:02 AM | Consolidate machine and move most used into the tool room with lesser used or non functional tools to be stored either in the shed or on pallet racking. |
Task | High | In Progress | Heavy Tools | Dust extraction |
Joshua Rospondek | Joshua Rospondek | 17/Feb/19 5:56 AM | 17/Feb/19 5:41 AM | Current dust extraction is inefficient and does not cover all heavy producers of dust and chips. |
Sub-task | High | In Progress | Heavy Tools | Dust extraction / Design new layout |
Joshua Rospondek | Joshua Rospondek | 17/Feb/19 5:47 AM | 17/Feb/19 5:43 AM | Create plans for new extraction network. |
Task | Medium | In Progress | General space | Doorbot rebuild |
Fletcher Boyd | Joshua Rospondek | 17/Feb/19 5:54 AM | 22/Jan/19 11:15 AM | |
Task | Medium | In Progress | General space | Foyer revamp |
Joshua Rospondek | Unassigned | 22/Feb/19 12:18 AM | 17/Feb/19 6:22 AM | |
Task | Medium | In Progress | Kitchen/Bar | Cutlery drawer |
Joshua Rospondek | Scott Simons | 18/Feb/19 4:04 AM | 18/Feb/19 4:04 AM | |
Sub-task | Medium | In Progress | General space | Test and tagging / Group discount |
Joshua Rospondek | Joshua Rospondek | 17/Feb/19 6:37 AM | 17/Feb/19 6:35 AM | Find out threshold for group discount and gather interest. |
Sub-task | Medium | In Progress | General space | Foyer revamp / Poetry bot display |
Joshua Rospondek | Unassigned | 22/Feb/19 12:20 AM | 17/Feb/19 6:24 AM | |
Sub-task | Medium | In Progress | General space | Foyer revamp / CCTV feed |
Joshua Rospondek | Fletcher Boyd | 22/Feb/19 12:18 AM | 17/Feb/19 6:24 AM | Outside CCTV feed for security late at night. |
Sub-task | Medium | In Progress | Heavy Tools | Machine consolidation / Belt grinder issues |
Joshua Rospondek | Joshua Rospondek | 20/Feb/19 5:11 PM | 17/Feb/19 5:32 AM | Precision sander is operate very loudly and inefficiently. Requires investigation. |
Task | Medium | In Progress | Music | Stage tidy up |
Joshua Rospondek | Joshua Rospondek | 22/Feb/19 12:14 AM | 22/Feb/19 12:14 AM | |
Sub-task | Medium | In Progress | General space | Foyer revamp / Digital notice board |
Joshua Rospondek | Fletcher Boyd | 17/Feb/19 1:55 PM | 17/Feb/19 6:23 AM | |
Task | Medium | In Progress | Heavy Tools | Swarf revamp |
Fletcher Boyd | Joshua Rospondek | 17/Feb/19 5:56 AM | 12/Jan/19 1:58 PM | Swarf-o-mat currently takes up an entire room. It shouldn't. |
Task | Low | In Progress | General space | Band room aircon |
Fletcher Boyd | Joshua Rospondek | 17/Feb/19 6:12 AM | 13/Feb/19 4:00 PM | |
Task | Low | In Progress | General space | Replace MDF signs |
Fletcher Boyd | Joshua Rospondek | 17/Feb/19 6:30 AM | 05/Jan/19 3:44 PM | |
Sub-task | Low | In Progress | General space | Band room aircon / IR extender |
Fletcher Boyd | Fletcher Boyd | 22/Feb/19 12:45 AM | 13/Feb/19 4:01 PM | Add an IR extender so that you can use the remote from inside the room |
Task | Highest | To Do | Z Lab | Clear Z Lab bench |
Joshua Rospondek | Unassigned | 22/Feb/19 12:24 AM | 17/Feb/19 6:03 AM | The Z Lab bench needs to be cleared to allow for concurrent completion of tasks such as new GPOs. |
Sub-task | Highest | To Do | Z Lab | Lab Design / Finalise design |
Joshua Rospondek | Unassigned | 17/Feb/19 6:06 AM | 17/Feb/19 6:06 AM | |
Task | High | To Do | Heavy Tools | PPE Wall |
Joshua Rospondek | Unassigned | 17/Feb/19 5:35 AM | 17/Feb/19 5:35 AM | |
Task | High | To Do | Heavy Tools | Vacuum consolidation |
Joshua Rospondek | Unassigned | 17/Feb/19 6:34 AM | 17/Feb/19 6:34 AM | Gather all vacuums in the space and determine if there is a need for hosing/attachments or new vacs. |
Sub-task | High | To Do | Heavy Tools | PPE Wall / Dust masks |
Joshua Rospondek | Unassigned | 17/Feb/19 5:36 AM | 17/Feb/19 5:36 AM | Make dust mask available on the PPE wall. |
Sub-task | High | To Do | Heavy Tools | Dust extraction / Reconnect machines |
Joshua Rospondek | Joshua Rospondek | 17/Feb/19 5:45 AM | 17/Feb/19 5:45 AM | |
Sub-task | High | To Do | Z Lab | Lab Design / Costing |
Joshua Rospondek | Unassigned | 17/Feb/19 6:06 AM | 17/Feb/19 6:06 AM | |
Sub-task | High | To Do | Z Lab | Construction / New GPOs |
Joshua Rospondek | Unassigned | 17/Feb/19 6:05 AM | 17/Feb/19 6:05 AM | |
Sub-task | High | To Do | Heavy Tools | Dust extraction / Install rigid mainline |
Joshua Rospondek | Joshua Rospondek | 17/Feb/19 5:45 AM | 17/Feb/19 5:45 AM | |
Sub-task | High | To Do | Heavy Tools | Dust extraction / Remove existing ducting |
Joshua Rospondek | Joshua Rospondek | 17/Feb/19 5:44 AM | 17/Feb/19 5:44 AM | |
Sub-task | High | To Do | Heavy Tools | Dust extraction / Move extractor and bin |
Joshua Rospondek | Joshua Rospondek | 17/Feb/19 5:44 AM | 17/Feb/19 5:44 AM | Move extractor and bin to new location if necessary. |
Task | Medium | To Do | Heavy Tools | Tool room lighting |
Joshua Rospondek | Fletcher Boyd | 17/Feb/19 5:30 AM | 17/Feb/19 5:21 AM | New lighting above all work surfaces in the tool room |
Task | Medium | To Do | Heavy Tools | Compressed air in tool room |
Joshua Rospondek | Fletcher Boyd | 17/Feb/19 5:30 AM | 17/Feb/19 5:26 AM | Establish availability for compressed air inside the tool room. |
Task | Medium | To Do | Electronics | Multimeters |
Joshua Rospondek | Unassigned | 17/Feb/19 6:09 AM | 17/Feb/19 6:09 AM | Lack of available portable multimeters in the space. |
Task | Medium | To Do | General space | Test and tagging |
Joshua Rospondek | Unassigned | 22/Feb/19 12:25 AM | 17/Feb/19 6:34 AM | The artifactory is required to demonstrate a documented regular maintenance program by competent person. |
Sub-task | Medium | To Do | General space | Test and tagging / Begin testing process |
Joshua Rospondek | Unassigned | 22/Feb/19 12:25 AM | 17/Feb/19 6:36 AM | |
Sub-task | Medium | To Do | General space | Test and tagging / Attain certification |
Joshua Rospondek | Unassigned | 22/Feb/19 12:25 AM | 17/Feb/19 6:35 AM | |
Sub-task | Medium | To Do | General space | Doorbot rebuild / Add visual unlock/denied indicator to outside wall |
Fletcher Boyd | Unassigned | 22/Feb/19 12:21 AM | 22/Jan/19 11:16 AM | |
Task | Medium | To Do | General space | Air con ducting |
Joshua Rospondek | Unassigned | 17/Feb/19 6:11 AM | 17/Feb/19 6:11 AM | More robust solution for ducting from air con units |
Sub-task | Medium | To Do | General space | Foyer revamp / Dinosaur display |
Joshua Rospondek | Unassigned | 17/Feb/19 6:24 AM | 17/Feb/19 6:24 AM | |
Task | Medium | To Do | General space | Remove cobwebs |
Joshua Rospondek | Unassigned | 17/Feb/19 6:29 AM | 17/Feb/19 6:29 AM | |
Sub-task | Medium | To Do | General space | Band room aircon / Remount piping |
Fletcher Boyd | Unassigned | 17/Feb/19 5:48 AM | 13/Feb/19 4:01 PM | Tape is not an effective mounting solution for the aircon output |
Sub-task | Medium | To Do | Electronics | Multimeters / Price and purchase |
Joshua Rospondek | Unassigned | 17/Feb/19 6:10 AM | 17/Feb/19 6:10 AM | |
Sub-task | Medium | To Do | Electronics | Multimeters / Seek sponsors |
Joshua Rospondek | Unassigned | 17/Feb/19 6:10 AM | 17/Feb/19 6:10 AM | Approach Altronics etc. for sponsored meters. |
Sub-task | Medium | To Do | Heavy Tools | Compressed air in tool room / Purchase attachments/tools |
Joshua Rospondek | Fletcher Boyd | 17/Feb/19 5:30 AM | 17/Feb/19 5:30 AM | Purchase and install convenient attachments for the new air drops. Most likely just air guns at this stage. |
Sub-task | Medium | To Do | Heavy Tools | Compressed air in tool room / Distribution |
Joshua Rospondek | Fletcher Boyd | 17/Feb/19 5:28 AM | 17/Feb/19 5:28 AM | Establish drops for compressed air throughout the tool room in convenient locations. |
Sub-task | Medium | To Do | Heavy Tools | Compressed air in tool room / Split off source |
Joshua Rospondek | Fletcher Boyd | 17/Feb/19 5:30 AM | 17/Feb/19 5:28 AM | Split off source of air for the tool room and route through the window ready for distribution. |
Sub-task | Medium | To Do | Heavy Tools | Tool room lighting / Install new lights |
Joshua Rospondek | Fletcher Boyd | 17/Feb/19 5:31 AM | 17/Feb/19 5:25 AM | |
Sub-task | Medium | To Do | Heavy Tools | Tool room lighting / Take lights out of storage |
Joshua Rospondek | Fletcher Boyd | 17/Feb/19 5:31 AM | 17/Feb/19 5:23 AM | Take down the lights from storage on the ceiling. |
Sub-task | Medium | To Do | Heavy Tools | PPE Wall / Earplugs |
Joshua Rospondek | Unassigned | 17/Feb/19 5:37 AM | 17/Feb/19 5:37 AM | Make disposable ear plugs available on the PPE wall. |
Sub-task | Medium | To Do | Heavy Tools | PPE Wall / Gloves |
Joshua Rospondek | Unassigned | 17/Feb/19 5:36 AM | 17/Feb/19 5:36 AM | Return gloves to PPE wall. |
Task | Medium | To Do | Electronics | Desoldering gun |
Joshua Rospondek | Unassigned | 17/Feb/19 1:54 PM | 17/Feb/19 6:07 AM | No working desoldering gun currently on the bench. |
Task | Medium | To Do | General space | New tool wall |
Joshua Rospondek | Fletcher Boyd | 17/Feb/19 6:01 AM | 17/Feb/19 6:01 AM | New tool wall to be located outside the tool room. |
Task | Medium | To Do | CAD Room | Vinyl cutter instructions |
Joshua Rospondek | Unassigned | 18/Feb/19 2:44 PM | 17/Feb/19 5:59 AM | Instructions for new users on the operation of the vinyl cutter. |
Sub-task | Medium | To Do | Heavy Tools | Swarf revamp / Remount thicknesser |
Fletcher Boyd | Unassigned | 17/Feb/19 5:39 AM | 12/Jan/19 10:14 PM | |
Sub-task | Medium | To Do | Heavy Tools | Swarf revamp / Mount secondary control box |
Fletcher Boyd | Unassigned | 17/Feb/19 5:39 AM | 12/Jan/19 1:59 PM | The secondary box (end stops?) is currently just sitting on a chair. |
Sub-task | Medium | To Do | General space | Doorbot rebuild / Shroud/Heat protection |
Joshua Rospondek | Unassigned | 17/Feb/19 5:49 AM | 13/Feb/19 4:14 PM | |
Sub-task | Medium | To Do | Heavy Tools | Swarf revamp / Explore replacement VFD |
Fletcher Boyd | Unassigned | 17/Feb/19 5:39 AM | 12/Jan/19 10:20 PM | I extracted a controllable VFD from some industrial equpiment a while ago, not sure if it works. It's stored under the red shelves. |
Sub-task | Medium | To Do | Heavy Tools | Swarf revamp / Remount swarf liquid cooling |
Fletcher Boyd | Unassigned | 17/Feb/19 5:39 AM | 12/Jan/19 10:19 PM | |
Sub-task | Medium | To Do | Heavy Tools | Swarf revamp / Swarf lighting |
Fletcher Boyd | Fletcher Boyd | 17/Feb/19 5:39 AM | 12/Jan/19 10:14 PM | |
Sub-task | Medium | To Do | Heavy Tools | Swarf revamp / Bending brake |
Fletcher Boyd | Unassigned | 17/Feb/19 5:39 AM | 12/Jan/19 10:14 PM | |
Sub-task | Medium | To Do | Heavy Tools | Swarf revamp / Remount/move mills |
Fletcher Boyd | Unassigned | 17/Feb/19 5:39 AM | 12/Jan/19 10:14 PM | |
Sub-task | Medium | To Do | Heavy Tools | Swarf revamp / Rebuild swarf table |
Fletcher Boyd | Unassigned | 17/Feb/19 5:39 AM | 12/Jan/19 10:14 PM | |
Sub-task | Medium | To Do | General space | Doorbot rebuild / Fix flaky sound |
Fletcher Boyd | Unassigned | 17/Feb/19 5:49 AM | 22/Jan/19 11:16 AM | |
Task | Low | To Do | Kitchen/Bar | Broom storage |
Joshua Rospondek | Unassigned | 17/Feb/19 6:16 AM | 17/Feb/19 6:16 AM | Establish a storage area for brooms/mops. |
Task | Low | To Do | Kitchen/Bar | Sink cupboard |
Joshua Rospondek | Unassigned | 17/Feb/19 6:17 AM | 17/Feb/19 6:17 AM | Build a cupboard underneath the sink. |
Task | Low | To Do | Kitchen/Bar | Bar display |
Joshua Rospondek | Unassigned | 17/Feb/19 6:20 AM | 17/Feb/19 6:20 AM | Backside of display is unused and using up space. |
Sub-task | Low | To Do | Kitchen/Bar | Bar display / Cut bar display |
Joshua Rospondek | Unassigned | 17/Feb/19 6:21 AM | 17/Feb/19 6:21 AM | Cut display in half to remove wasted space. |
Sub-task | Low | To Do | Kitchen/Bar | Bar display / Display support |
Joshua Rospondek | Unassigned | 17/Feb/19 6:21 AM | 17/Feb/19 6:21 AM | Build new support for the bar and remove existing tables. |
Task | Low | To Do | General space | Fix up social area blimp |
Fletcher Boyd | Unassigned | 17/Feb/19 6:31 AM | 14/Jan/19 4:36 PM | |
Sub-task | Low | To Do | General space | Blimp / Web interface |
Fletcher Boyd | Blake Samuels | 17/Feb/19 6:31 AM | 13/Feb/19 4:29 PM | |
Sub-task | Low | To Do | General space | Blimp / More RGB |
Fletcher Boyd | Blake Samuels | 17/Feb/19 6:31 AM | 13/Feb/19 4:29 PM | |
Sub-task | Low | To Do | General space | Blimp / Rewrap |
Fletcher Boyd | Fletcher Boyd | 17/Feb/19 6:31 AM | 13/Feb/19 4:29 PM | |
Task | Low | To Do | General space | Social table |
Joshua Rospondek | Unassigned | 17/Feb/19 6:14 AM | 17/Feb/19 6:14 AM | New table for the social area |
Task | Low | To Do | General space | New storage trolleys |
Joshua Rospondek | Unassigned | 17/Feb/19 6:25 AM | 17/Feb/19 6:25 AM | |
Task | Low | To Do | General space | Project tables |
Joshua Rospondek | Unassigned | 17/Feb/19 6:26 AM | 17/Feb/19 6:26 AM | |
Sub-task | Low | To Do | General space | New storage trolleys / Branding |
Joshua Rospondek | Unassigned | 17/Feb/19 6:28 AM | 17/Feb/19 6:28 AM | Brand tables with artifactory logo. |
Sub-task | Low | To Do | General space | New storage trolleys / Light bar colour coding |
Joshua Rospondek | Unassigned | 17/Feb/19 6:29 AM | 17/Feb/19 6:29 AM | Colour code the tables with their corresponding light bar to make it easier to find the right light. |
Sub-task | Low | To Do | Heavy Tools | Tool room lighting / Remove old lighting |
Joshua Rospondek | Fletcher Boyd | 17/Feb/19 5:31 AM | 17/Feb/19 5:25 AM | Remove old lighting if found to be redundant. |
Sub-task | Low | To Do | Heavy Tools | Machine consolidation / Catalogue hand power tools |
Joshua Rospondek | Unassigned | 17/Feb/19 5:13 AM | 17/Feb/19 5:11 AM | Take an inventory of power tool available in the space |
Sub-task | Low | To Do | Heavy Tools | Machine consolidation / Drop saw handle concern |
Joshua Rospondek | Unassigned | 17/Feb/19 5:34 AM | 17/Feb/19 5:10 AM | Drop saw handle is warm when powered but not running. |
Sub-task | Low | To Do | Heavy Tools | Dust extraction / Move extractor power switch |
Joshua Rospondek | Joshua Rospondek | 17/Feb/19 5:45 AM | 17/Feb/19 5:45 AM | |
Task | Low | To Do | CAD Room | Air con water extraction |
Joshua Rospondek | Unassigned | 17/Feb/19 5:58 AM | 17/Feb/19 5:58 AM | Air con condensation currently collected in a bucket above the CAD room. Mel to deal with. |
Task | Low | To Do | CAD Room | Air con switch |
Joshua Rospondek | Fletcher Boyd | 17/Feb/19 1:53 PM | 17/Feb/19 5:57 AM | Move air con switch to inside the CAD room. |
Sub-task | Low | To Do | Heavy Tools | Swarf revamp / Movable arm for swarf control |
Fletcher Boyd | Unassigned | 17/Feb/19 5:39 AM | 13/Jan/19 1:45 PM | Mount the aluminium extrusion currently being used for water cooling to a hinge on the wall. Add a vertical adjustment system (nested pipes?) and a brace along the arc of the arm. |
Sub-task | Lowest | To Do | Heavy Tools | Machine consolidation / Consumable QR codes |
Joshua Rospondek | Unassigned | 17/Feb/19 5:12 AM | 17/Feb/19 5:12 AM | Add QR codes on machines with consumables (e.g., sanders) to inform members of where to purchase more. |